Zibo Shenbo Machinelectronics Co., Ltd

NEWS

Dedicated to provide you with quality products with higher cost performance

Check category
Check category

Home > News Details

NEW DETAILS

How to install several DC governors

2019-09-06 08:03
Zibo Shenbo Machinelectronics Co., Ltd
 
For the DC governor, I must always pay attention to the friends of our website. But for its installation method, maybe everyone will not understand it!
1, desktop DC governor: directly placed on a fixed table, machine, shell plane.
2. Integrated DC governor: The motor is integrated with the governor.
3, panel type installation DC governor: generally embedded in the distribution cabinet, distribution box, machine equipment surface, installation requires opening, and must meet the size requirements of the governor itself.
4, wall-mounted DC governor: directly installed in the power distribution cabinet, distribution box, machinery and equipment inside the body. It is a convenient installation structure.
The above are the four installation methods of the DC governor. Have you learned it?

Visit us by Mobile

Zibo Shenbo Machinelectronics Co., Ltd

Contact Us

Zibo Shenbo Machinelectronics Co., Ltd
Address:76 Beishanlu,Boshan District,Zibo City,Shandong Province.China.

Tel:+86-533-2641999 /2641409 /2641974 /3571658 /3571651
Fax:+86-533-4180974 /3571655
E-mail:info@shenbomotor.cn

CopyRight © 2019 Zibo Shenbo Machinelectronics Co., Ltd All Rights Reserved.
鲁ICP备08011629号-1  Powered by:www.300.cn